Follow
José Fernando Gonçalves
José Fernando Gonçalves
Universidade do Porto, Faculdade de Economia, INESC TEC, LIAAD
Verified email at fep.up.pt - Homepage
Title
Cited by
Cited by
Year
A hybrid genetic algorithm for the job shop scheduling problem
JF Gonçalves, JJ de Magalhães Mendes, MGC Resende
European Journal of Operational Research 167 (1), 77-95, 2005
8752005
Biased random-key genetic algorithms for combinatorial optimization
JF Gonçalves, MGC Resende
Journal of Heuristics 17 (5), 487-525, 2011
7162011
A genetic algorithm for the resource constrained multi-project scheduling problem
JF Gonçalves, JJM Mendes, MGC Resende
European journal of operational research 189 (3), 1171-1190, 2008
5212008
An evolutionary algorithm for manufacturing cell formation
JF Gonçalves, MGC Resende
Computers & Industrial Engineering 47 (2-3), 247-273, 2004
3722004
A random key based genetic algorithm for the resource constrained project scheduling problem
JJM Mendes, JF Gonçalves, MGC Resende
Computers & operations research 36 (1), 92-109, 2009
3642009
A hybrid genetic algorithm for assembly line balancing
JF Gonçalves, JR De Almeida
Journal of Heuristics 8 (6), 629-642, 2002
2582002
A biased random key genetic algorithm for 2D and 3D bin packing problems
JF Gonçalves, MGC Resende
International Journal of Production Economics 145 (2), 500–510, 2013
2252013
A biased random-key genetic algorithm for the unequal area facility layout problem
JF Gonçalves, MGC Resende
European Journal of Operational Research 246 (1), 86–107, 2015
2042015
A parallel multi-population biased random-key genetic algorithm for a container loading problem
JF Gonçalves, MGC Resende
Computers & Operations Research 39 (2), 179–190, 2012
2042012
A hybrid genetic algorithm-heuristic for a two-dimensional orthogonal packing problem
JF Gonçalves
European Journal of Operational Research 183 (3), 1212-1229, 2007
1422007
A biased random-key genetic algorithm with forward-backward improvement for the resource constrained project scheduling problem
JF Gonçalves, MGC Resende, JJM Mendes
Journal of Heuristics 17 (5), 467-486, 2011
1352011
A parallel multi-population genetic algorithm for a constrained two-dimensional orthogonal packing problem
JF Gonçalves, MGC Resende
Journal of Combinatorial Optimization 22 (2), 180-201, 2011
114*2011
An extended Akers graphical method with a biased random-key genetic algorithm for job-shop scheduling
JF Gonçalves, MGC Resende
International Transactions in Operational Research 21 (2), 215-246, 2014
110*2014
A hybrid particle swarm optimization and simulated annealing algorithm for the job shop scheduling problem with transport resources
DBMM Fontes, SM Homayouni, JF Gonçalves
European Journal of Operational Research, 2022
1092022
Gestão de Aprovisionamentos
JF Gonçalves
Publindustria, 2002
992002
A genetic algorithm approach for the single machine scheduling problem with linear earliness and quadratic tardiness penalties
JMS Valente, JF Gonçalves
Computers & Operations Research 36 (10), 2707-2715, 2009
752009
The multi-parent biased random-key genetic algorithm with implicit path-relinking and its real-world applications
CE Andrade, RF Toso, JF Gonçalves, MGC Resende
European Journal of Operational Research 289 (1), 17-30, 2021
712021
A container loading algorithm with static mechanical equilibrium stability constraints
MP Ramos, A. G., Oliveira, J. F., Gonçalves, J. F., & Lopes
Transportation Research Part B: Methodological 91, 565-581, 2016
712016
An experimental comparison of biased and unbiased random-key genetic algorithms
JF Gonçalves, MGC Resende, RF Toso
Pesquisa Operacional 34 (2), 143-164, 2014
64*2014
A multistart biased random key genetic algorithm for the flexible job shop scheduling problem with transportation
SM Homayouni, DBMM Fontes, JF Gonçalves
International Transactions in Operational Research 30 (2), 688-716, 2022
602022
The system can't perform the operation now. Try again later.
Articles 1–20