Follow
Anita Varga
Title
Cited by
Cited by
Year
An estimation of the learning effect on project cost scheduling
L Mályusz, A Varga
Procedia engineering 196, 723-729, 2017
112017
An estimation of the learning curve effect on project scheduling with working days calculation
L Mályusz, A Varga
Periodica Polytechnica Architecture 47 (2), 104-109, 2016
92016
An Estimation of the Learning Curve Effect on Project Scheduling with Calendar Days Calculation
L Mályusz, A Varga
Procedia engineering 196, 730-737, 2017
82017
An estimation of the learning curve effect on project duration with Monte Carlo simulation
L Mályusz, A Varga
Periodica Polytechnica Architecture 49 (1), 66-71, 2018
42018
Integrating combinatorial algorithms into a linear programming solver
R Molnár-Szipai, A Varga
Central European Journal of Operations Research 27 (2), 475-482, 2019
22019
A New Ai–Zhang Type Interior Point Algorithm for Sufficient Linear Complementarity Problems
M E.-Nagy, A Varga
Journal of Optimization Theory and Applications, 1-32, 2022
12022
A new long-step interior point algorithm for linear programming based on the algebraic equivalent transformation
M E.-Nagy, A Varga
Central European Journal of Operations Research, 1-21, 2022
12022
New Ai-Zhang type long-step interior point algorithms using the algebraically equivalent transformation technique
A Varga
2022
The system can't perform the operation now. Try again later.
Articles 1–8