Mályusz Levente
Title
Cited by
Cited by
Year
Predicting future performance by learning curves
L Malyusz, A Pem
Procedia-Social and Behavioral Sciences 119, 368-376, 2014
302014
Benchmarking facilities operation and maintenance management using CAFM database: Data analysis and new results
L Róka-Madarász, L Mályusz, P Tuczai
Journal of building engineering 6, 184-195, 2016
272016
Prediction of the learning curve in roof insulation
L Mályusz, A Pém
Automation in construction 36, 191-195, 2013
252013
Modeling spatial and temporal relationships in network techniques
M Hajdu, L Mályusz
Procedia Engineering 85, 193-205, 2014
92014
An estimation of the learning curve effect on project scheduling with working days calculation
L Mályusz, A Varga
Periodica Polytechnica Architecture 47 (2), 104-109, 2016
82016
Learning curve effect on project scheduling
L Malyusz
Procedia engineering 164, 90-97, 2016
82016
How would you like it: cheaper or shorter
L Mályusz, M Hajdu
Organization, technology & management in construction: an international …, 2009
72009
Convex program based on the Young inequality and its relation to linear programming
P Kas, E Klafszky, L Mályusz
Central European Journal for Operations Research 7 (3), 291-304, 1999
71999
An Estimation of the Learning Curve Effect on Project Scheduling with Calendar Days Calculation
L Mályusz, A Varga
Procedia engineering 196, 730-737, 2017
62017
An estimation of the learning effect on project cost scheduling
L Mályusz, A Varga
Procedia engineering 196, 723-729, 2017
42017
A Költségtervezési "time-costtrade-off" feladat általánosítása és megoldása
L Mályusz
Alkalmazott Matematikai Lapok 21, 1-13, 2004
42004
Approximation of linear programs by Bregman's DF projections
P Kas, E Klafszky, L Mályusz, G Izbirak
European Journal of Operational Research 126 (1), 69-79, 2000
42000
An estimation of the learning curve effect on project duration with Monte Carlo simulation
L Mályusz, A Varga
Periodica Polytechnica Architecture 49 (1), 66-71, 2018
32018
Arrangement of material depots for line segment–modeled structures using continuous conditions
A Pém, L Mályusz
Organization, technology & management in construction: an international …, 2016
32016
Arrangement of material depots at construction site by using continuous conditions
A Pém, L Mályusz
Creative Construction Conference Proceedings, 323-328, 2016
22016
Model of Arrangement of Final Material Depots for Concave Construction Sites in CSLP
A Pém, L Mályusz
PROCEDIA ENGINEERING 123, 388-396., 2015
22015
Time analysis of networks with bi-directional precedence relationships: A case study
M Hajdu, L Malyusz, ZA Vattai
14TH INTERNATIONAL CONFERENCE ORGANIZATION, TECHNOLOGY AND MANAGEMENT IN …, 2019
12019
Model for “Bath Tub” effect in construction
L Mályusz, A Pém
Creat. Constr. Conf., 2014
12014
Comparison of different algorithms for time analysis for CPM schedule networks
L Malyusz, M Hajdu, Z Vattai
Automation in Construction 127, 103697, 2021
2021
Negative weights in network time model
ZA Vattai, L Mályusz
Frontiers of Engineering Management, 0, 2020
2020
The system can't perform the operation now. Try again later.
Articles 1–20