Follow
Nezam Mahdavi-Amiri
Nezam Mahdavi-Amiri
Distinguished Professor of Mathematical Sciences, Sharif University of Technology
Verified email at sharif.edu - Homepage
Title
Cited by
Cited by
Year
Designing a model of fuzzy TOPSIS in multiple criteria decision making
I Mahdavi, N Mahdavi-Amiri, A Heidarzade, R Nourifar
Applied mathematics and Computation 206 (2), 607-617, 2008
3302008
Duality results and a dual simplex method for linear programming problems with trapezoidal fuzzy variables
N Mahdavi-Amiri, SH Nasseri
Fuzzy sets and systems 158 (17), 1961-1978, 2007
2642007
Duality in fuzzy number linear programming by use of a certain linear ranking function
N Mahdavi-Amiri, SH Nasseri
Applied mathematics and computation 180 (1), 206-216, 2006
2112006
Fuzzy primal simplex algorithms for solving fuzzy linear programming problems
AN MAHDAVI, SH Naseri, AB Yazdani
Iranian Journal of Operations Research 1 (2), 68-84, 2009
1192009
A new linear programming approach and genetic algorithm for solving airline boarding problem
M Soolaki, I Mahdavi, N Mahdavi-Amiri, R Hassanzadeh, A Aghajani
Applied Mathematical Modelling 36 (9), 4060-4072, 2012
1122012
A multi-objective decision-making process of supplier selection and order allocation for multi-period scheduling in an electronic market
H Fazlollahtabar, I Mahdavi, MT Ashoori, S Kaviani, N Mahdavi-Amiri
The International Journal of Advanced Manufacturing Technology 52, 1039-1052, 2011
1042011
Comprehensive fuzzy multi-objective multi-product multi-site aggregate production planning decisions in a supply chain under uncertainty
N Gholamian, I Mahdavi, R Tavakkoli-Moghaddam, N Mahdavi-Amiri
Applied soft computing 37, 585-607, 2015
992015
A dynamic programming approach for finding shortest chains in a fuzzy network
I Mahdavi, R Nourifar, A Heidarzade, NM Amiri
Applied soft computing 9 (2), 503-511, 2009
982009
Two new conjugate gradient methods based on modified secant equations
S Babaie-Kafaki, R Ghanbari, N Mahdavi-Amiri
Journal of computational and applied Mathematics 234 (5), 1374-1386, 2010
942010
A genetic algorithm for solving fuzzy shortest path problems with mixed fuzzy arc lengths
R Hassanzadeh, I Mahdavi, N Mahdavi-Amiri, A Tajdin
Mathematical and Computer Modelling 57 (1-2), 84-99, 2013
902013
Supplier selection using a clustering method based on a new distance for interval type-2 fuzzy sets: A case study
A Heidarzade, I Mahdavi, N Mahdavi-Amiri
Applied Soft Computing 38, 213-231, 2016
872016
A fuzzy programming approach for dynamic virtual hub location problem
F Taghipourian, I Mahdavi, N Mahdavi-Amiri, A Makui
Applied Mathematical Modelling 36 (7), 3257-3270, 2012
832012
A new efficient approach to search for all multi-state minimal cuts
M Forghani-elahabad, N Mahdavi-Amiri
IEEE Transactions on Reliability 63 (1), 154-166, 2014
652014
Some duality results on linear programming problems with symmetric fuzzy numbers
SH Nasseri, N Mahdavi-Amiri
Fuzzy information and engineering 1 (1), 59-66, 2009
612009
Computing a fuzzy shortest path in a network with mixed fuzzy arc lengths using α-cuts
A Tajdin, I Mahdavi, N Mahdavi-Amiri, B Sadeghpour-Gildeh
Computers & Mathematics with Applications 60 (4), 989-1002, 2010
592010
Multiresolution surfaces having arbitrary topologies by a reverse Doo subdivision method
F Samavati, N Mahdavi‐Amiri, R Bartels
Computer Graphics Forum 21 (2), 121-134, 2002
582002
Toward sustainable optimization with stackelberg game between green product family and downstream supply chain
M Pakseresht, B Shirazi, I Mahdavi, N Mahdavi-Amiri
Sustainable Production and Consumption 23, 198-211, 2020
502020
A bi-objective possibilistic programming model for open shop scheduling problems with sequence-dependent setup times, fuzzy processing times, and fuzzy due dates
S Noori-Darvish, I Mahdavi, N Mahdavi-Amiri
Applied Soft Computing 12 (4), 1399-1416, 2012
502012
A genetic algorithm for optimization problems with fuzzy relation constraints using max-product composition
R Hassanzadeh, E Khorram, I Mahdavi, N Mahdavi-Amiri
Applied Soft Computing 11 (1), 551-560, 2011
502011
Lot streaming in a two-stage assembly hybrid flow shop scheduling problem with a work shift constraint
M Nejati, I Mahdavi, R Hassanzadeh, N Mahdavi-Amiri
Journal of Industrial and Production Engineering 33 (7), 459-471, 2016
492016
The system can't perform the operation now. Try again later.
Articles 1–20